Skip to content
Discuss sourcing

Trial quantities for PCB tools: separate pieces needed from boxes ordered

You need seven drills of one part number and thirteen of another for a PCB tool trial. In this example, two suppliers reply. Both pack ten of the same part number in a box. Supplier A sells whole boxes, starting at one box per part number. Supplier B requires at least thirty drills per part number. Those replies change how many drills you would have to buy.

Three numbers that answer different questions

The minimum order quantity (MOQ) is the smallest order the seller accepts under the stated terms. Ask if it applies to the exact code, a family, or the whole order. Pack size is what is inside a box. The order increment tells you what quantities can be added when ordering. A box of 10 does not tell you whether the seller breaks boxes or requires three boxes before accepting an order.

In one Union Tool online listing, the pack contains 10 pieces, the price is quoted per piece, and orders are placed in increments of 10. That describes one drill and channel, not a universal PCB-tool minimum or permission to mix diameters. Use the written offer for the exact code and sales channel.

0.80 mm; Trial need: 7 pieces; Whole boxes: 1 box of 10; Minimum for this code: 30 pieces (3 boxes)0.80 mmTrial need: 7 piecesWhole boxes: 1 box of 10Minimum for this code: 30 pieces (3 boxes)
0.80 mm
Trial need: 7 pieces
Whole boxes: 1 box of 10
Minimum for this code: 30 pieces (3 boxes)
Fictional 0.80 mm line only. Solid dots are the seven trial pieces; hollow dots are surplus. Each box holds ten of the same code. The bottom row shows what changes if a 30-piece minimum applies.
Full part number and diameter (fictional) Trial need Full boxes only If minimum is 30 pieces per line
TD-080-A (0.80 mm) 7 pieces 1 box = 10, excess 3 3 boxes = 30, excess 23
TD-100-B (1.00 mm) 13 pieces 2 boxes = 20, excess 7 3 boxes = 30, excess 17

Across the two part numbers, A comes to three boxes and B to six. If both can deliver by the trial start date and A costs less after repacking and delivery, choose A for the trial. Set any surplus aside until the results are in.

Ask separately whether different part numbers can share a box and whether their quantities can count toward a shared minimum. If the supplier can mix tools in a box, ask how each part number will be identified. Leave unanswered terms open. Keep both pieces and boxes on the purchase sheet, and record any trial-only exception separately from replenishment terms.

Copyable inquiry (fictional)

For the trial we need 7 tools of full part number TD-080-A (0.80 mm) and 13 of TD-100-B (1.00 mm). Please state the pack size, order increment, MOQ and its scope, and the smallest sellable quantity in pieces and boxes for each line. Can you supply exact quantities or a mixed pack? If so, tell us how you would label the tools and list any extra charges. Please give the expected dispatch date and arrival date for each offer. Separately, can quantities of different part numbers count toward one minimum? This is a request for quotation. We’ll place an order separately once we’ve confirmed the quantities and terms.