Part function, drawing revision and destination: Material grade/temper, thickness and required finished state: Prototype method, sample IDs, manual corrections and deviations: What did the prototype actually verify, and what was not assessed? Proposed production operations, die identity/revision and intended press: Feeding/transfer and differences from the trial equipment or handling: Critical features, burr/edge requirements, forming and finishing: Measurement datums, support/clamping and before/after finishing state: Trial conditions, samples/run plan, inspection and change records: Die acceptance, part acceptance and routine-supply release decisions: Tooling charge scope, keeping/maintenance, documents and handover terms: Required follow-up, reviewer, quantity and open questions: