1. Handover scope Please identify the tool, inserts, spares, controls, drawings and data included, with the applicable release conditions. 2. Receiving equipment Please identify mismatches and required work for mounting, ejection, nozzle, temperature control, cooling, power and controls. 3. Trial and continuity Please show trial, correction, reapproval and first-delivery timing against the reference parts and records, with unresolved assumptions identified.